DT/DICT and roadworks: mandatory checks before works start
DT and DICT declarations often precede street permit applications. Authorities benefit from integrating them into one workflow.
Missing declarations expose project owners and complicate authority review.
Linking DT/DICT, permits, and traffic orders in one file improves traceability.
Frequently asked questions
- What is the difference between DT and DICT?
- DT is an early project declaration used to identify networks and prepare the project. DICT is the declaration submitted before works begin in order to secure the actual start of the worksite.
- Are roadworks affected by these obligations?
- Yes, whenever works are close to buried or overhead utility networks. This is especially common in roadworks, roadway resurfacing, urban redesign, and VRD projects.
- Why connect these steps to the permit workflow?
- Because missing DT/DICT checks can delay the project, create safety risks, and weaken the overall review process. It is useful to trace this control within the same workflow as street permits and traffic documents.
- Which items should be checked?
- The project qualification, responses to the declarations, the known network plan, safety constraints, and clearly identified site contacts before works begin.